现今公路施工和运营中出现的诸多问题,这是由多方面原因造成的,在地质条件复杂的山岭地区进行路线设计中,"地质选线"好坏是控制成本的最主要因素之一[1]。结合成渝高速公路设计,归纳了目前山区高速公路设计中存在的典型地质问题,有区域稳定性问题、地形地质环境问题以及高速公路本身结构有关的工程地质问题。列举实例讲述了"地质选线"思想如何体现在工程设计中:"地质选线"要在全过程中加强比选工作,而不是一味整治,从而合理控制成本。
Abstract:Nowadays many problems have emerged during the freeway construction and operation that are caused by many reasons. "Geological Route Selection"good or bad is one of the most important factors for controlling costs in mountainous areas where geological conditions are complex for route design[1]. In this paper,take Chengyu expressway as an example,summarized some typical geological problems existing in the mountain highway,such as the regional stability issues,topographic and geologic environmental issues as well as geological problems related to structure of highway engineering. Provide examples about the"Geological Route Selection"ideas how embodied in engineering design: "Geological Route Selection"means strengthening the route comparison during whole work,so as to control costs.
[1]JTG D20-2006,公路路线设计规范[S].
[2]高文涛.山岭区复杂地质高速公路地质选线方法[J].公路,2012(05).
[3]陈国照.浅谈工程地质选线对山区高速(高等级)公路工程造价的影响[J].地质灾害与环境保护,2006(3).
[4]JTJ 064—98,公路工程地质勘察规范规范[S].
[5]冼长策.浅谈山区高速公路建设中的地质问题[J].科技创新导报,2008(25).
[6]霍明.建设生态公路考虑的几个问题[A].中交第一公路勘察设计研究院公路勘察设计技术论文集[C].西安:陕西人民出版社,2002.
[7]何振宁.区域工程地质与铁路选线[M].北京:中国铁道出版社,2004.
[8]盛泽.山区高速公路施工通道的选线与施工[J].湖南交通科技,2012,38(1):42-44.
基本信息:
中图分类号:U412.32
引用信息:
[1]孙广远.山区高速公路地质选线实例研究[J].公路工程,2013,38(05):258-262.
2013-10-20
2013-10-20